![background image](http://html1.mh-extra.com/html/daikin/ehfz03s18dj3v/ehfz03s18dj3v_installers-reference-manual_4270858063.webp)
7
|
Unit installation
Installer reference guide
63
ERLA EHFZ03S18DJ3V
Daikin Altherma 3 R F
4P596821-1B – 2021.10
7.5 Finishing the outdoor unit installation
7.5.1 To finish the outdoor unit installation
NOTICE
It is recommended that the refrigerant piping between indoor and outdoor unit is
installed in a ducting or the refrigerant piping is wrapped with finishing tape.
INFORMATION
For the requirements of the refrigerant piping insulation, see
65].
1
Insulate and fix the refrigerant piping and cables as follows:
g
b
a
f
e
c
d
a
Gas pipe
b
Gas pipe insulation
c
Interconnection cable
d
Field wiring (if applicable)
e
Liquid pipe
f
Liquid pipe insulation
g
Finishing tape
2
Install the service cover.