Indoor Unit
SiBE04-809
146
Removal Procedure
1.9
Removal of Electrical Box
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
Remove the front grille.
Discharge the static
electricity from your body
before touching the electrical
parts like signal receiver
PCB.
It may cause malfunction of
PCB.
1. Remove the electrical
box.
1
Loosen the screw of the
drip proof plate.
2
Lift and remove the drip
proof plate.
When assembling, insert the
left hook of the drip proof
plate into the hem plate of
the heat exchanger.
Drip proof plate
Signal receiver
Electrical
box
Limit
switch
(R5057)
Summary of Contents for ARXG25E3V1B
Page 1: ...SiBE04 809 Applied Models Inverter Pair Heat Pump Inverter Pair Wall Mounted Type E Series ...
Page 11: ...Introduction SiBE04 809 x ...
Page 12: ...SiBE04 809 List of Functions 1 Part 1 List of Functions 1 List of Functions 2 ...
Page 14: ...SiBE04 809 Specifications 3 Part 2 Specifications 1 Specifications 4 ...