SiBE04-809
Main Functions
Function and Control
17
1.3
Operation Starting Control
The system carries out the following control at the beginning to conduct every functional parts
properly.
1. Opening the front panel fully
2. Output of the
∆
D signal after the front panel starts moving
3. Opening the flap fully after the front panel opens fully
4. Making the fan rotate when the flap passes over the fan-banned area
Control Flow
Timing Chart
Opening the front panel
fully
Start
Running
Output of the
∆
D signal after
the front panel starts moving
Making the fan rotate when
the flap passes over the
fan-banned area
Opening the flap fully
(R3311)
TDELTA
Fully close
OFF
Start
ON
Front
panel
Flap
Under running control
Under running control
Under operation mode control
Under operation mode control
The outdoor unit provides force
when it receives the
∆
D signal.
Louvers
Fan
Force supply
(from the
outdoor unit)
∆
D
Fully open
Fully open
Fully close
Right
Left
ON
OFF
OFF
Output
ON
∆
0
Fan-banned area
Operation
starting control
(R3312)
Summary of Contents for ARXG25E3V1B
Page 1: ...SiBE04 809 Applied Models Inverter Pair Heat Pump Inverter Pair Wall Mounted Type E Series ...
Page 11: ...Introduction SiBE04 809 x ...
Page 12: ...SiBE04 809 List of Functions 1 Part 1 List of Functions 1 List of Functions 2 ...
Page 14: ...SiBE04 809 Specifications 3 Part 2 Specifications 1 Specifications 4 ...