10. Display Unit Calibration and Setup
PNEG-1323
Integra Feed-Link
35
The third menu item is
:
“ID”
1. Press the UP and DOWN arrow buttons at
the same time to enter the initial
configuration setup, then press the CAL
button twice and this menu item will appear
on the screen.
2. If all the bins are to be used with the RS485
network collector they must each have a
unique bin node ID. Use the UP/DOWN
arrow buttons to select the first digit and
press ENTER.
3. Use the UP/DOWN arrow buttons to select
the second digit and press ENTER. The bin
node ID entered must be between 1 and 50.
The bin node ID should be recorded for each
bin to be used later during network
configuration. The unit will return to the
normal display once the second digit has
been selected.
The fourth menu item is
:
“Re-Init Bin”
1. This will return settings to factory default
values in the setup menus. By pushing the
Up and Down arrow buttons at the same
time, the display unit enters the Initial
configuration setup, then press CAL button
three times and this menu item will appear in
the screen.
2. Push the UP/DOWN arrows to toggle
between “Yes” and “NO” menu selection.
Selecting “Yes” will set the display unit back
to its factory default values.
3. This can be used when a load cell is marked
bad, it can only be recovered by going back
to factory defaults. Additionally, if a load cell
is ever replaced, a return to factory defaults
must be performed.
The last procedure to perform to properly initialize
the display unit is to perform a calibration
when the bin is full.
Figure 10E ID Display Screen
Figure 10F Re-Init Bin Display Screen