5. Installing Stand Alone Display Units
PNEG-1323
Integra Feed-Link
19
Installing Stand Alone Bin
Mounted Display Units
(Continued)
2. Set voltage jumpers
a. For 110V line up the two (2) jumpers
with 110V holes.
b. For 220V line up the two (2) jumpers
with 220V holes.
3. Connect power wires
a. Run power wire ends through water tight
heyco nut cap and then into display box
as shown in
b. Place line wire (black) onto line 1, ground
wire (green) onto earth, and neutral wire
(tan or white) onto line 2.
c. Pull excess length of wire down through
water tight heyco nut and tighten.
d. Close display box lid and fasten using
supplied hardware.
Figure 5H Voltage Jumper Location
Figure 5I A) Close-up of 110V Jumper Setting.
B) Close-up of 220V Jumper Setting.
Figure 5J Power Connections
B
A
Line 1
(line)
Earth
(ground)
Line 2
(neutral)