
94
VOCE Media
Se
cti
o
n
10
- D
ia
gn
o
stic
an
d
Ma
in
te
n
an
ce
P
ro
ce
d
u
re
s
3. Take the new grinder body complete with inner grinder ring from the service kit.
Screw the grinder body clockwise into the blade housing until it stops.
Re-set the grinder blades. An approximate starting position is achieved by turning
the grinder body back one full turn anti-clockwise. Re-assemble the grinder
adjuster wheel assembly to the grinder unit.
4. Refit the fresh beans container to the machine. Pull the bean canister shut- off to
its fully extended position.
5. Turn on the electricity supply to the machine.
Important! Before returning the machine to service, the engineer must carry out
the Grinder Calibration routine (see Para 5.7.2.1) to ensure correct operation of the
grinder with the type of beans used in the machine. Use the grinder adjuster wheel
to fine tune the blade settings in order to obtain the desired grind quality.
Summary of Contents for Voce Media
Page 1: ...Part Number PR15302000 Issue B Aug 2015 Technical Manual ...
Page 8: ...VIII VOCE Media ...
Page 12: ...4 VOCE Media Section 1 Machine Specifications ...
Page 24: ...16 VOCE Media Section 3 How to Vend a Drink ...
Page 70: ...62 VOCE Media Section 5 Engineer s Program ...
Page 74: ...66 VOCE Media Section 6 Service Keypad Functions ...
Page 80: ...72 VOCE Media Section 7 Technical Information ...
Page 86: ...78 VOCE Media Section 9 Dispense Pipe Lengths ...
Page 108: ...100 VOCE Media Section 11 Electrical Electronic Diagrams 11 6 Input Circuit 2 ...
Page 110: ...102 VOCE Media Section 11 Electrical Electronic Diagrams 11 8 Output Circuit 2 ...
Page 112: ...104 VOCE Media Section 11 Electrical Electronic Diagrams 11 10 Power Circuit B2C Machines ...
Page 114: ...106 VOCE Media ...
Page 115: ...Technical Manual A FRESH APPOACH TO VENDING ...