These technical instructions contain useful and important information for the correct
installation, operation and maintenance of the Remeha Avanta boiler.
Read these instructions carefully before putting the boiler into operation,
familiarise yourself with their control functions and operation, strictly observing the
instructions given. Failure to do so may invalidate warranty or prevent the boiler from
operating correctly.
The installation, commissioning, Inspection and servicing of the boiler must be
carried out by a competent registered Engineer who holds valid ACS certification and
in accordance with current gas safety (installation and use) regulations, the building
regulations and all other relevant codes of practice.
All electrical work must be carried out by a competent Engineer and to be installed in
accordance with the current IEE regulations.
It is the responsibility of the installer to ensure that all flue systems are installed in
accordance with manufacturers instructions and all the requirements of EN 14471.
Summary of Contents for Avanta 12v
Page 34: ...fig 16 Connecting external controls R000158 A page 18 ...
Page 35: ......
Page 63: ...fig 42 Read out settings LT AL W7H 000 046 ...
Page 68: ...fig 43 Change parameters in service level LT AL W7H 000 047 ...
Page 70: ...fig 44 Change boiler output LT AL W7H 000 048 ...
Page 87: ...fig 59 Assembling the boiler 59970LTGBW7H031 page 44 4 ERRORS 4 1 General ...
Page 96: ......
Page 99: ...fig 62 Exploded view Remeha Avanta 59970EVGBW7H010 ...
Page 108: ...page 60 ...
Page 109: ...page 61 ...