appear during this time, the boiler will then start to run if called for by the
controls.
•
The boiler now starts to run. The operational status is shown in the display.
Combustion checking/setting must be carried out by a competent person. It
must not be carried out unless that person is equipped with a combustion
analyser which conforms to the relevant British Standards.
fig. 37 Power on and controls on heat demand
R000165-A
4.
Setting the gas/air ratio at full load
The Avanta boilers are suitable for both natural gas and propane firing (restrictor
required for propane not supplied). The boilers are supplied as standard set for
natural gas (G20), therefore the following procedure must be carried out BEFORE
the boilers are fired and commissioned for the first time on propane:
- fit restrictor (instructions supplied);
- adjust the fan speed (for procedure see
, for values
- adjust the gas/air ratio (for values see
Summary of Contents for Avanta 12v
Page 34: ...fig 16 Connecting external controls R000158 A page 18 ...
Page 35: ......
Page 63: ...fig 42 Read out settings LT AL W7H 000 046 ...
Page 68: ...fig 43 Change parameters in service level LT AL W7H 000 047 ...
Page 70: ...fig 44 Change boiler output LT AL W7H 000 048 ...
Page 87: ...fig 59 Assembling the boiler 59970LTGBW7H031 page 44 4 ERRORS 4 1 General ...
Page 96: ......
Page 99: ...fig 62 Exploded view Remeha Avanta 59970EVGBW7H010 ...
Page 108: ...page 60 ...
Page 109: ...page 61 ...