guidelines and instructions for the connection of gas, water, electricity, safety
devices, the regulator, control unit, flue discharge and air supply.
2.2.1 Installation / maintenance clearance requirements
The gas connection is located on the bottom of the boiler whilst the water
connections, air inlet and flue gas outlet are located on the top of the boiler. The
boiler is supplied as standard with gas pipe work tails.
For installation, servicing and inspection min. 600 mm in front of the boiler is
required. If this free space is obtained by opening a door or removing a panel, the
boiler may be installed for instance in a closed cupboard. All servicing / inspection /
repairs are made from the front of the boiler.
For ease of installation we recommend clearances of 0.5 cm at the side so that the
unit is easy to open, with a free space of 25 cm under the appliance and 25 cm
above the appliance, as the minimum requirement.
However once installed, it is possible to reduce these clearances to 22 cm at the top,
and 25 cm at the bottom provided the boiler front panel can be removed and the
isolating valves are easily accessible without the use of tools.
Summary of Contents for Avanta 12v
Page 34: ...fig 16 Connecting external controls R000158 A page 18 ...
Page 35: ......
Page 63: ...fig 42 Read out settings LT AL W7H 000 046 ...
Page 68: ...fig 43 Change parameters in service level LT AL W7H 000 047 ...
Page 70: ...fig 44 Change boiler output LT AL W7H 000 048 ...
Page 87: ...fig 59 Assembling the boiler 59970LTGBW7H031 page 44 4 ERRORS 4 1 General ...
Page 96: ......
Page 99: ...fig 62 Exploded view Remeha Avanta 59970EVGBW7H010 ...
Page 108: ...page 60 ...
Page 109: ...page 61 ...