55
Grid Code:
3 Standard codes are available – IEEE1547,
Rule21, ISO-NE. Other SRDs can be implemented
by manual configuration of settings.
PV Link Type
:
(N/A – 1 MPPT)
Neutral Line Setting
: Select if a neutral is connect or not
RS485
:
Choosing the communication data
Modbus
Address
and Baud Rate (9600).
Each Inverter on
a daisy chain must have a unique Modbus
Address.
Inverter Clock
:
Set the system clock
When the device screen shows the normal operation status (Figure
4-2) and the “RUN” light on the LED panel is illuminated, this is an
indication that the grid connection and power generation are successful.
INSTRUCTION:
Please check with your local electricity supply company before
selecting a grid standard. If the inverter is operated with a wrong grid
standard, the electricity supply company may cancel the
interconnection agreement. Placing the inverter into operation before
the overall system complies with the national rules and safety
regulations of the application is not permitted.
Summary of Contents for SCH Series
Page 2: ......
Page 4: ......
Page 43: ...39 Figure 3 25 AC Output Cable Connection Distributed Wire box L1 L2 L3 ...
Page 45: ...41 Figure 3 27 AC Output Cable Connection Centralized Wire box Ver 2 ...
Page 58: ...54 Figure 4 1 System setting ...
Page 81: ...77 5 4 2 6 Others The REF column is reference to Table 5 7 Enable functions ...
Page 90: ...86 WiFi to Inverter ...
Page 92: ...88 ...
Page 93: ...89 5 5 History There are 2 submenus in the History menu Alarm and Running Status ...