3.1 Recommendations Before Installation
See
Chapter 8
, Technical Data for specification ranges and limits.
Check that the product environmental specifications (protection degree,
operating temperature range, humidity and altitude, etc.) meet the
requirements of the specific project location.
Make sure that the power grid voltage is within range for the grid standard
chosen.
Ensure that the local electricity supply authority has granted permission to
connect to the grid.
Installation personnel must be qualified electricians or those who have
received professional training.
Wear and use proper PPE (personal protective equipment) during
installation.
Sufficient space according to Figure 3-4 and 3-5 must be provided to allow
the inverter cooling system to operate normally.
Install the inverter away from flammable and explosive substances.
Avoid installing the inverter in locations that exceed the temperature limits
specified for the inverter to prevent undesirable power loss.
Do not install the inverter near an electromagnetic source which can
compromise the normal operation of electronic equipment.
The PV Array is not grounded.
The conduits entries meet the following:
ALL Conduit Entries must use water-tight fittings.
ALL Conduit Entries should use sealant around wires inside wirebox
to prevent moisture ingress.
ALL Conduit Fittings should be metal to contain any thermal event
in the wirebox – cause by moisture ingress.
Summary of Contents for SCH Series
Page 2: ......
Page 4: ......
Page 43: ...39 Figure 3 25 AC Output Cable Connection Distributed Wire box L1 L2 L3 ...
Page 45: ...41 Figure 3 27 AC Output Cable Connection Centralized Wire box Ver 2 ...
Page 58: ...54 Figure 4 1 System setting ...
Page 81: ...77 5 4 2 6 Others The REF column is reference to Table 5 7 Enable functions ...
Page 90: ...86 WiFi to Inverter ...
Page 92: ...88 ...
Page 93: ...89 5 5 History There are 2 submenus in the History menu Alarm and Running Status ...