4
DANGER:
Please disconnect the inverter from AC grid and PV modules before
opening the equipment. Make sure hazardous high voltage and energy
inside the equipment has been discharged.
Do not operate or maintain the inverter until at least 5 minutes after
disconnecting all sources from DC and AC sides.
NOTICE:
This inverter is designed to connect AC power only to the public grid.
Do not connect the AC output of this equipment directly to any private
AC power equipment.
CAUTION:
CPS SCH100KTL/US-600 and CPS SCH125KTL/US-600 inverters are
approx.
72kg (158 lbs)
. Please ensure the mounting bracket is
properly installed before hanging the inverter and wire-box on the
bracket.
INSTRUCTION:
Please check with your local electricity supply company before
selecting a grid standard. If the inverter is operated with a wrong grid
standard, the electricity supply company may cancel the
interconnection agreement.
Placing the inverter into operation before the overall system complies
with the national rules and safety regulations of the application is not
permitted.
Summary of Contents for SCH Series
Page 2: ......
Page 4: ......
Page 43: ...39 Figure 3 25 AC Output Cable Connection Distributed Wire box L1 L2 L3 ...
Page 45: ...41 Figure 3 27 AC Output Cable Connection Centralized Wire box Ver 2 ...
Page 58: ...54 Figure 4 1 System setting ...
Page 81: ...77 5 4 2 6 Others The REF column is reference to Table 5 7 Enable functions ...
Page 90: ...86 WiFi to Inverter ...
Page 92: ...88 ...
Page 93: ...89 5 5 History There are 2 submenus in the History menu Alarm and Running Status ...