53
4.3 Commissioning Steps
Complete the checklist above before commissioning the inverter as follows:
1.) Turn on the AC circuit breaker.
2.) Turn on the DC circuit breaker. (Skip these two steps if there are no
circuit breakers.)
3.) Switch the DC Switch to the “ON” position. When the energy
supplied by the PV array is sufficient, the LED of inverter will light up.
The inverter will then start up.
4.4
Connection to the inverter – Wireless
Once powered, the inverter will automatically create a wireless network
that will be visible as an Access Point from the user devices (tablet,
smartphone, etc.), connection to the inverter via Wi-Fi .
Open the APP (“CPS CONNECT PRO” previously mentioned)
Enable the wireless connection on the device which is being used for
the board setup (tablet or smartphone) and connect it to the Access Point
created by the inverter system: the name of the wireless network created
by the system that the connection should be established with, will be:
CPLK-XXXXXXX where “X” can be found on the “LinKIT Label” placed on
the side of the LinKIT model).
Please input the password
“
Password
”
(Capital P)
then set the “grid-code”, PV Link Type, Neutral Line, RS485 and
Inverter Clock” as shown in Figure 4-1.
Summary of Contents for SCH Series
Page 2: ......
Page 4: ......
Page 43: ...39 Figure 3 25 AC Output Cable Connection Distributed Wire box L1 L2 L3 ...
Page 45: ...41 Figure 3 27 AC Output Cable Connection Centralized Wire box Ver 2 ...
Page 58: ...54 Figure 4 1 System setting ...
Page 81: ...77 5 4 2 6 Others The REF column is reference to Table 5 7 Enable functions ...
Page 90: ...86 WiFi to Inverter ...
Page 92: ...88 ...
Page 93: ...89 5 5 History There are 2 submenus in the History menu Alarm and Running Status ...