![Cornelius FCB - 2 Flavor Service Manual Download Page 52](http://html1.mh-extra.com/html/cornelius/fcb-2-flavor/fcb-2-flavor_service-manual_2667818052.webp)
Pinnacle 2 and 4 Flavor Service Manual
H
ALL
E
FFECT
S
ENSOR
D
IAGNOSIS
& R
EPLACEMENT
- B
ALDOR
Hall Board Diagnostic Procedure:
DANGER
— HIGH VOLTAGE, this testing is done with the Pinnacle power ON. Care must be
taken to avoid high voltage areas of the inverter board.
This procedure will test the Hall Board on Barrel #1.
1.
Locate Connector 'J2' on the Inverter Board
• Pin 1 - Red - +5 volts
• Pin 2 - White - Hall #1
• Pin 3 - Brown - Hall #2
• Pin 4 - Green - Hall #3
• Pin 5 - Black - Ground
Using a voltmeter in the 'DC' mode, measure 5 volts between Pin 1 and Pin 5 (Red and Black). If 5 volts is
present, continue. If not, remove the connector from “J2”, and measure the same pins on the Inverter board.
If 5 volts is present, the cabling to the Hall board, or the Hall board itself, is bad. Replace it. If the 5 volts is
not present, the Inverter board is bad. Replace it.
FIGURE 51
2.
Place Barrel #1 in the OFF mode. Remove the product
and face plate from barrel #1. Keep the beater bar
engaged with the drive magnet in the back of the freeze
cylinder. You will be slowly turning the beater bar by hand.
Rotate slowly.
FIGURE 52
Connect black
lead from the
meter to the black
wire connection at
connector.
Rotate slowly and
watch for the hall
board to switch.
Move the red lead
and repeat test.
© 2003-2014, Cornelius Inc.
- 48 -
Publication Number: 560007298SER
Summary of Contents for FCB - 2 Flavor
Page 75: ......