![Cookson Speedline Technologies Electrovert Bravo 8105 Preventive Maintenance Manual Download Page 66](http://html1.mh-extra.com/html/cookson/speedline-technologies-electrovert-bravo-8105/speedline-technologies-electrovert-bravo-8105_preventive-maintenance-manual_2660435066.webp)
M O N T H L Y P R E V E N T I V E M A I N T E N A N C E P R O C E D U R E S
Pin Chain Conveyor (Option) Lubrication
5-52
Bravo™ 8105 Preventive Maintenance Guide
Rev. 2
5
Procedure
Use All–Purpose grease on the Load End and Unload End shafts. There is a screw
shaft and a linear shaft on the Load End and a screw shaft and a hex shaft on the
Unload end. A 3/4 in. Acme threaded shaft is located in the center of the oven.
To access the center shaft it is necessary to remove the ten (10) screws with a 3
mm Allen wrench. Refer to Figure 5–11.
• Clean the each of the width shafts with denatured alcohol to remove any
accumulation of residue.
• Use a camel hair brush or similar applicator to apply the All–Purpose (AP)
grease along the length of the Load End shaft.
• Wipe any excess with a clean lint-free cloth.
• Repeat for the Unload End shafts.
• Use a camel hair brush to apply Krytox grease to the center width shaft.
• Wipe any excess with a clean lint–free cloth.
• Replace the cover to the center width shaft.
Photograph
Figure 5–11