
Basic Functional Test
976-0043-01-01
4–5
Confirming Inverter Operation
To confirm that the inverter is operating correctly:
◆
Disconnect the AC input power by turning the input AC power
breaker off or unplugging the AC power cord.
•
The inverter should transfer to inverter mode immediately. This
will be indicated by the INVERT (yellow) LED illuminating.
•
The inverter will begin to produce an low audible “buzz” as it
takes power from the batteries and uses it to power the loads.
•
The loads should continue to operate uninterrupted.
This completes the functional test. If all areas pass, the inverter is ready
for use. If any of the inverter’s internal set points are to be adjusted,
consult the programming chapters of this manual.
Summary of Contents for SW 2524
Page 2: ......
Page 3: ...Sine Wave Plus Inverter Charger Owner s Manual...
Page 24: ...xxii...
Page 26: ...xxiv...
Page 82: ...2 48...
Page 105: ...DC Wiring 976 0043 01 01 3 23 Figure 3 13 DC Connections to a Single Inverter...
Page 107: ...DC Wiring 976 0043 01 01 3 25 Figure 3 14 DC Connections to Dual Inverters...
Page 126: ...3 44...
Page 132: ...4 6...
Page 139: ...Menu Map 976 0043 01 01 5 7 Figure 5 4 User Menu Map Part 2...
Page 141: ...Menu Map 976 0043 01 01 5 9 Figure 5 6 Basic Setup Menu Map Part 2...
Page 143: ...Menu Map 976 0043 01 01 5 11...
Page 144: ...Navigation 5 12 976 0043 01 01...
Page 145: ...Menu Map 976 0043 01 01 5 13...
Page 146: ...Navigation 5 14 976 0043 01 01...
Page 208: ...7 36...
Page 240: ...8 32...
Page 268: ...B 10...
Page 286: ...C 18...
Page 290: ...D 4...
Page 294: ...E 4...
Page 316: ...I 6...
Page 319: ...Index 976 0043 01 01 IX 3...
Page 320: ...Index IX 4 976 0043 01 01...
Page 321: ......