9.
Commissioning
ATTENTION!
The lifting unit is now operational.
/
Plug in the unit and carry out a function test. Allow water to flow into the tank. The lifting unit
turns on as soon as the electrical power supply is established and the water level in the tank is
above the switch on level.
/
Check all connections/pipe lines for leaks.
/
In addition, observe the specifications in DIN EN 12056-4.
/
Check that the pump is set to “AUTO” operation.
10.
Maintenance
ATTENTION!
Before carrying out any maintenance work on the unit, all power lines should be disconnected from
the mains and care should be taken that the unit cannot be inadvertently switched back on. Check the
pressure line for damage.
To avoid danger if the power cable is damaged, it must be replaced by the manufacturer or its
service agent or a similarly qualified person.
Change the active charcoal filter:
/
At least once a year.
/
In case of unpleasant odours.
/
Where water has discharged through the filter.
In case of decreasing pump performance remove possible deposits and other substances from the
tank.
If necessary, clean the inlet screen of the pump. To do so, loosen the screen by turning the bayonet
lock and remove it. After cleaning, place the screen with o-ring on the pump and lock it in place by
turning it (see page 42, figure 7).
In addition, observe the specifications in DIN EN 12056-4. In case of problems, please contact your
CONEL
supplier.
36
Summary of Contents for FLOWBOX-N
Page 20: ...16 Explosionszeichnung 16 1 Hebeanlage Abbildung 6 20...
Page 21: ...16 2 Pumpe Abbildung 7 21...
Page 22: ...17 Ersatzteile 1 2 3 Dichtung 10 4 5 15 16 17 18 19 20 6 12 13 14 9 8 7 11 Dichtung DN 50 22...
Page 41: ...16 Exploded drawings 16 1 Lifting station Figure 6 41...
Page 42: ...16 2 Pump Figure 7 42...
Page 43: ...17 Spare parts 1 2 3 seal 10 4 5 15 16 17 18 19 20 6 12 13 14 9 8 7 11 DN 50 seal 43...
Page 62: ...16 Sch mas en vue clat e 16 1 Station de relevage Illustration 6 62...
Page 63: ...16 2 Pompe Illustration 7 63...
Page 64: ...17 Pi ces de rechange 1 2 3 joint 10 4 5 15 16 17 18 19 20 6 12 13 14 9 8 7 11 joint DN 50 64...
Page 83: ...16 Splittegninger 16 1 L ftestasjon Figur 6 83...
Page 84: ...16 2 Pumpe Figur 7 84...
Page 85: ...17 Reservedeler 1 2 3 tetning 10 4 5 15 16 17 18 19 20 6 12 13 14 9 8 7 11 tetning DN 50 85...
Page 104: ...16 Rozlo en v kresy 16 1 Zvedac stanice Obr 6 104...
Page 105: ...16 2 erpadlo Obr 7 105...
Page 106: ...17 N hradn d ly 1 2 3 t sn n 10 4 5 15 16 17 18 19 20 6 12 13 14 9 8 7 11 t sn n DN 50 106...
Page 125: ...16 Robbantott br k 16 1 temel llom s 6 bra 125...
Page 126: ...16 2 Szivatty 7 bra 126...
Page 146: ...16 Planos de despiece 16 1 Estaci n elevadora Figura 6 146...
Page 147: ...16 2 Bomba Figura 7 147...
Page 148: ...17 Piezas de repuesto 1 2 3 junta 10 4 5 15 16 17 18 19 20 6 12 13 14 9 8 7 11 junta DN 50 148...
Page 150: ......
Page 151: ......