UGH015/0100
Thermolator TW-1 and TW-2
T
ROUBLESHOOTING
6-25
Reattach the pump to
the volute case.
Make
sure you replace any dam-
aged gasket or O-ring
between the pump assembly
and volute case. Check for
free rotation after assembly is
completed.
NOTE:
Before restarting, close all drain openings using
sealant on the threads and and refill the unit with fluid.
Do not start the the pump when the unit is dry.
D
ISASSEMBLING
AND
A
SSEMBLING
3 - 7.5
HP
P
UMPS
9
Summary of Contents for Thermolater vacuTrac
Page 9: ...Figure 1...
Page 12: ......
Page 15: ......
Page 16: ......
Page 50: ......
Page 62: ......
Page 100: ......
Page 106: ......
Page 117: ...UGH015 0100 TW 1 230 460V WIRING DIAGRAM PD 5...
Page 119: ...UGH015 0100 TW 2 230 460V WIRING DIAGRAM PD 7 2...