UGH015/0100
Thermolator TW-1 and TW-2
T
ROUBLESHOOTING
6-19
Reassemble the valve and other components.
Reassemble in reverse order.
Seal all pipe fittings
with pipe sealant. Check that all flows are in the correct
direction. Check for leaks before resuming operation.
R
EPAIRING
S
OLENOID
V
ALVES
Nameplate
Cover
*
Yoke
*
Housing
*
7/8" Dia. Hole
for 1/2" Conduit
Solenoid Base
Sub-Assembly
0.9375-26 UNS-2A
Thread
Core (AC)
Tapped Hole in Core
0.250-28 UNF-2B
0.38 Minimum Full Thread
or
Retaining Clip
*
Retaining Cap
*
Sleeve
*
Grounding Wire
(Not present on all constructions)
Insulating Washer
Sleeve
*
Spring
Washer
*
Housing
*
with Nameplate
*
*
Indicates Parts Supplied
in Solenoid Enclosure Kit
Alternate Construction with
Nameplate on Housing
Coil
Insulating Washer
9
*
Indicates Parts Supplied
in Solenoid Enclosure Kit
Cover
*
Yoke
*
7/8" Dia. Hole
for 1/2" Conduit
Solenoid Base
Sub-Assembly
0.9375-26 UNS-2A
Thread
Core (AC)
Tapped Hole in Core
0.250-28 UNF-2B
0.38 Minimum Full Thread
or
Retaining Clip
*
Sleeve
*
Grounding Wire
(Not present on all constructions)
Sleeve
*
Coil
Summary of Contents for Thermolater vacuTrac
Page 9: ...Figure 1...
Page 12: ......
Page 15: ......
Page 16: ......
Page 50: ......
Page 62: ......
Page 100: ......
Page 106: ......
Page 117: ...UGH015 0100 TW 1 230 460V WIRING DIAGRAM PD 5...
Page 119: ...UGH015 0100 TW 2 230 460V WIRING DIAGRAM PD 7 2...