XSAT7080 X-Band Transceiver
Revision 0
50 and 100-Watt Installation
MN/XSAT7080.IOM
B–25
Step
Procedures
28 Tighten
hardware.
29
Install the assembled waveguide switch (Figure B-18) and waveguide gaskets.
30
Secure assembly with bolts, lock washers and flat washers from hardware kits
supplied with each XSAT unit (not shown, PN AS/0402-2).
Figure B-22. Installation of the Waveguide Switch.
gure 2-23 Waveguide layout
B.6.2.3
A
SSEMBLE
LNA S
WITCH
K
IT
, AS/9751-1