6
Item
Name
Function
1
Return Banana
Receptacle
Connected to the Return Lead on the Hipot or Ground Continuity
Tester, which is normally connected to dead metal parts of the
equipment undergoing dielectric test.
2
Output Banana
Receptacle
Connected to the high voltage output of the Hipot Tester being
checked. If a Ground Continuity Tester is being checked, connect to
the high current output.
3
Arc View
When Dielectric Breakdown function is being checked, a spark will be
visually demonstrated the breakdown occurred.
4
Hipot Test
Switch
When set to FAIL, a dielectric breakdown will be simulated and a spark
can be seen in the Arc View window. When set to PASS, a normal
passing result is simulated. Used for Dielectric Testers only.
5
Leakage Test
Switch
When set to FAIL, an excess leakage condition is simulated and the
tester should stop testing and indicate a failure. When set to PASS, a
normal passing result is simulated. Used for Dielectric Testers only.
6
Ground Test
Switch
When set to FAIL, an open ground is simulated and the tester should
stop testing and indicate a failure. When set to PASS, a normal passing
result is simulated.
Table 2: HTT-1 front panel Controls, Indicators, and Connectors
Summary of Contents for HTT-1
Page 1: ...HTT 1 Function Tester Instruction Manual COMPLIANCE WEST USA...
Page 2: ...i...
Page 4: ...ii...
Page 10: ...5 Figure 1 HTT 1 Front Panel Features 6 5 4 3 1 2...