background image

 

ii 

 
 

Dear Customer: 

 

Congratulations!  Compliance West USA is proud to present you 

with your HTT-1. The operating instructions are included in the 

Manual, so please retain this information for future use. 

 

Thank you for your trust and confidence. 

 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Rev. 2.0, February 2009

Summary of Contents for HTT-1

Page 1: ...HTT 1 Function Tester Instruction Manual COMPLIANCE WEST USA...

Page 2: ...i...

Page 3: ...ons Compliance West USA is proud to present you with your HTT 1 The operating instructions are included in the Manual so please retain this information for future use Thank you for your trust and conf...

Page 4: ...ii...

Page 5: ...troduction and Specifications 2 Introduction 2 Specifications 2 Operation 3 Setting up the HTT 1 3 Front Panel Features 3 Setup Procedure Hipot Tester 3 Setup Procedure Ground Continuity Tester 4 Unan...

Page 6: ...a time to ensure that your testers are functioning correctly A proper test plan would be constituted of the following tests 1 Connect HTT 1 to the tester outputs 2 Set all three switches on the HTT 1...

Page 7: ...fication tool The HTT 1 is warranted for a period of one year upon shipment to the original purchaser Specifications Specifications for the HTT 1 are listed in Table 1 below Table 1 Specifications of...

Page 8: ...continuity tester Because of the varying types of tester outputs cables are not provided with the HTT 1 For custom cables please contact Compliance West USA 1 Connect the hipot tester to the HTT 1 a O...

Page 9: ...tester identify the return lead of the high current output This is connected to the black banana jack receptacle of the HTT 1 b On your ground continuity tester plug the HTT 1 into the high current re...

Page 10: ...5 Figure 1 HTT 1 Front Panel Features 6 5 4 3 1 2...

Page 11: ...breakdown occurred 4 Hipot Test Switch When set to FAIL a dielectric breakdown will be simulated and a spark can be seen in the Arc View window When set to PASS a normal passing result is simulated Us...

Page 12: ...ROUND LEAKAGE HIPOT Operating mode PASS PASS PASS No failure the tester connected to the HTT 1 should indicate test completion with a passing result FAIL PASS PASS Ground Fail the tester connected to...

Page 13: ...748 6224 Technical Assistance is available from Compliance West USA between the hours of 8 30 AM and 4 30 PM Pacific Time Monday through Friday Compliance West USA 2120 Jimmy Durante Blvd Suite 124 De...

Reviews: