ComNav G2 & G2B Installation & Operation
Document PN 29010093 V1.5
- 40 -
16 December 2016
Standard Cable (15
meters)
NMEA 2000 cable
Note
Wire Colour
Signal
Wire
Colour
Signal
Pink
NET_S
Red
NET_S
Connect to G2 power or a separate
power, positive
Pink/Black
stripe
NET_C
Black
NET_C
Connect to G2 power or a separate
power, negative
Blue
CAN_L
Blue
CAN_L
White
CAN_H
White
CAN_H
Bare
Drain
Clear
Shield
!!If a separate power NMEA 2000 power
is used,
Do NOT connect NMEA 2000 shield to
the standard cable shield, or the
junction box
Table 5 – connect G2 to CAN Bus
Wiring for NMEA 2000 system
When used in a NMEA 2000 network, the G2 is a “plug & play” device. See Figure 1 for a
connection example.
Summary of Contents for Vector G2
Page 2: ......
Page 6: ...ComNav G2 G2B Installation Operation Document PN 29010093 V1 5 4 16 December 2016...
Page 12: ...ComNav G2 G2B Installation Operation Document PN 29010093 V1 5 10 16 December 2016...
Page 14: ...ComNav G2 G2B Installation Operation Document PN 29010093 V1 5 12 16 December 2016...
Page 19: ...ComNav G2 G2B Installation Operation Document PN 29010093 V1 5 17 16 December 2016...
Page 43: ...ComNav G2 G2B Installation Operation Document PN 29010093 V1 5 41 16 December 2016 Operation...
Page 44: ...ComNav G2 G2B Installation Operation Document PN 29010093 V1 5 42 16 December 2016...
Page 59: ...ComNav G2 G2B Installation Operation Document PN 29010093 V1 5 57 16 December 2016...
Page 83: ...ComNav G3 G3B Installation Operation Document PN 29010093 V1 5 81 16 December 2016...
Page 84: ...ComNav G3 G3B Installation Operation Document PN 29010093 V1 5 82 16 December 2016 Index...
Page 85: ...ComNav G3 G3B Installation Operation Document PN 29010093 V1 5 83 16 December 2016...
Page 87: ...ComNav G2 G2B Installation Operation Document PN 29010093 V1 5 85 16 December 2016...
Page 88: ...ComNav G2 G2B Installation Operation Document PN 29010093 V1 5 86 16 December 2016 User Notes...
Page 89: ...ComNav G2 G2B Installation Operation Document PN 29010093 V1 5 87 16 December 2016...