![ComNav Vector G2 Installation & Operation Manual Download Page 29](http://html1.mh-extra.com/html/comnav/vector-g2/vector-g2_installation-and-operation-manual_2644198029.webp)
ComNav G2 & G2B Installation & Operation
Document PN 29010093 V1.5
- 27 -
16 December 2016
4) Push the cable through the center 1.5” hole of the mounting surface before
placing the unit in its position
5) Place the G2 on the surface, aligning each drill hole with a respective bolt hole
on the unit. Push the M8 bolts from the bottom through the surface and hand
tighten all 8 bolts.
6) Once all the M8 bolts are placed, tighten the bolts with a ratchet to fully secure
the unit to the surface. Take care to avoid over tightening.
Figure 12 - Assembled Deck Mount (bracket not included)
Note: it is important to place a locking compound such as Loctite on the
threads of the bolts prior to fastening them.
7) Push 8 M8 bolts from the bottom through the gasket and hand tighten all 8 bolts.
Once all the M8 bolts are placed, tighten the bolts with a ratchet to fully secure
the unit to the surface. Take care to avoid over tightening.
Summary of Contents for Vector G2
Page 2: ......
Page 6: ...ComNav G2 G2B Installation Operation Document PN 29010093 V1 5 4 16 December 2016...
Page 12: ...ComNav G2 G2B Installation Operation Document PN 29010093 V1 5 10 16 December 2016...
Page 14: ...ComNav G2 G2B Installation Operation Document PN 29010093 V1 5 12 16 December 2016...
Page 19: ...ComNav G2 G2B Installation Operation Document PN 29010093 V1 5 17 16 December 2016...
Page 43: ...ComNav G2 G2B Installation Operation Document PN 29010093 V1 5 41 16 December 2016 Operation...
Page 44: ...ComNav G2 G2B Installation Operation Document PN 29010093 V1 5 42 16 December 2016...
Page 59: ...ComNav G2 G2B Installation Operation Document PN 29010093 V1 5 57 16 December 2016...
Page 83: ...ComNav G3 G3B Installation Operation Document PN 29010093 V1 5 81 16 December 2016...
Page 84: ...ComNav G3 G3B Installation Operation Document PN 29010093 V1 5 82 16 December 2016 Index...
Page 85: ...ComNav G3 G3B Installation Operation Document PN 29010093 V1 5 83 16 December 2016...
Page 87: ...ComNav G2 G2B Installation Operation Document PN 29010093 V1 5 85 16 December 2016...
Page 88: ...ComNav G2 G2B Installation Operation Document PN 29010093 V1 5 86 16 December 2016 User Notes...
Page 89: ...ComNav G2 G2B Installation Operation Document PN 29010093 V1 5 87 16 December 2016...