IGS-NT Installation Guide
118
7) When gen-set is running unloaded increase carefully
Voltage gain
to unstable point
and then decrease value by 30 % to insure stable performance.
8) Adjust
Voltage int
(usually setting to 100% gives optimal performance).
Hint:
To judge optimal adjusting induce generator voltage jumps by
AVR DCout bias
change or by
Nominal voltage
change.
AVRi output
OCOM
is a common output. GND was used instead of OCOM
17.2.3.
PF control adjustment
The genset should be cca 30 % loaded in parallel to mains and baseload mode.
1)
Set the same values
PF gain,
PF int
as in voltage control loop.
2)
Set
Process control
:
#SysLdCtrl PtM
= BASELOAD, #Sys
BaseLoad
= 30 % of
Nominal load,
#SysPFCtrl PtM
= BASEPF, #
SysPwrFactor
= 1.0.
3)
Start and synchronize the gen-set in MAN Mode by pressing GCB ON/OFF
4)
When running in parallel 30% loaded increase slowly
PF gain
to unstable point and
then decrease value by 30 % to insure stable performance.
5)
Adjust
PF int
(usually setting to 100% gives optimal performance).
Hint:
To judge optimal adjusting induce generator power jumps by
SysBaseLoad
change or by
soft changes of
AVR DCout bias
.
Summary of Contents for IG-NT
Page 24: ...IGS NT Installation Guide 24 5 2 3 InteliVision 5 5 2 4 InteliVision 8...
Page 75: ...IGS NT Installation Guide 75 9 Recommended Wiring 9 1 SPtM application...
Page 76: ...IGS NT Installation Guide 76 9 2 SPI application...
Page 77: ...IGS NT Installation Guide 77 9 3 MINT application...