Notes:
Page 34 of 107
SmartLF Gx Service Manual
8.
When fitting PSU to access panel, insert the first M4 pan head
screw in the top Right Hand corner making sure the earth
cables are screwed between the PSU and the threaded post.
9.
Insert the remaining M4 screws and tighten them all up.