AN 06/2003
page
9. WORKING WITH THE PROCESSOR
in the morning:
- Check all chemical levels - processor tanks and Replenishment storage
tanks - top up if necessary. If the process controller detects a „low level“
in the Developer and Bleach processor tanks then add small amounts of warm
water.
- Check the levels in the overflow „waste“ containers - empty if necessary.
- Place the processor from „Sleep“mode into production „Work“ mode.
When the machine reaches its „Ready“ state it is recommended to load and
read a process control test strip before running calibration or production
prints.
normal working :
(Program: P1 READY)
- Operate the machine for the production of RA4 Paper and Display film only.
- Allow materials to automatically exit the dryer
in the evening:
- Empty the waste collection containers
19
NOTE :
In a situation where local laws / building laws / insurance reasons do not allow the use
of a Sleep mode during the nights and weekend periods then it will be necessary (with the
processor off) to open the 1
st
top cover to prevent condensation inside the processor.
Top Cover