2. BEFORE INSTALLATION
Site preparation should be completed before delivery and installation.
2.1 LOCATION
Location. All dimensions for the processor are detailed in the technical data sheet.
It is important that the processor location is well ventilated and with the required air
changes per hour – follow all recommendations from the chemical supplier.
We recommend a minimum walking space of 60cm around the processor.
2.2 ELECTRICAL SUPPLY
*)
All electrical connections must meet national safety requirements. Correct fuses and
electrical requirement can be taken from the processor specification/data sheet.
multi terminal block
power cord
inline circut breaker
2.3 WATER SUPPLY (OPTIONAL)
It is necessary to connect the processor directly to a fresh water supply for cooling
and rinse. To do this, locate the installed 2-way magnetic valve. See the picture below:
We recommend that a water supply (preferably warm water) and working area are
available close-by to the machine for the purpose of cleaning rollers and tanks.
Magnetic Valve