Page 4 of 60
3.0 SET
UP
3.1 UNPACKING
AND
SETTING
UP
YOUR
ANALYZER
Remove the balance from the packing by carefully lifting it out of the box.
Inside the box you will find everything needed to start using the analyzer-
AC power cable
Pan Support
Stainless Steel Lower Chamber Insert
Sample Pan Lifter
Sample Pans (Qty 10)
Spare Fuse 5A, Time Lag, High capacity
This User Manual
IMPORTANT:
Before applying power make sure the balance is configured for the power in
your area. The analyzer will have a label on the rear panel showing the
voltage required: 115VAC (±10%) or 230VAC (±10%). If the label does not
match your power do not attempt to use the analyzer, damage to the balance
could result.
The balance should be positioned to allow easy access to the power
connection on the rear panel. Ensure the power cable is fully engaged to
ensure safe operation.
Summary of Contents for MB-200-40
Page 1: ...P N 3076611320 Revision B July 2022 MB 200 40 Moisture Analyzer 2022...
Page 2: ...2022...
Page 3: ......
Page 5: ...Page 2 of 60...
Page 60: ...Page 57 of 60 Page 57 2022...