CQUBE SERIES
11
INSTALLATION AND START-UP
Place the machine on a fl at horizontal surface that will
support the weight of the machine.
When assembled with a base cabinet: Fix the CQube
machine together with the base cabinet with supplied
M6 X 35 screws.
Connect the water to the top cabinet on the
machine.
Connect the supplied water hose to the cold water
connection using a ½’’ R-connection. When pushing
the machine into position make sure there is no
interference to the hose to ensure proper water
fl ow.
If the inlet hose is new, fl ush the system with water
fi rst to remove copper shavings. These can damage
the inlet valve.
The new tube set supplied with the appliance must be
used. Old tubes may not be re-used. Connection to a
closable valve is recommended.
Min. water pressure; 2 bar (200kPa).
Max. water pressure: 8 bar (800kPa).
Make sure air is able to circulate behind
the machine (minimum 10cm).
Positioning
Machine startup procedure for CQube SF SE
minimum 10cm
Switch
Note
Open the water tap.
Connect the mains cable to the machine (A) and insert the plug to a earthed wall socket.
Switch on the power switch on the rear of the machine. See fi gure.
The display indicates
Low Water Level
Press Enter Key
Press the
/
ENTER
button.
The water tank will now automatically fi ll with 1.8 litres of water. The element will not be powered until
the water reaches the level sensor.
Set temperature is 96º Celsius.
Once the water heating is complete “Low temp” text will disappear from the display. (The display text
will start to rotate).
A