P/N 91025, Rev. 4
Page 21
3
SETUP
IN THIS CHAPTER:
3.1 R
ECEIPT
AND
INSPECTION
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -21
3.2 P
REPARING
THE
MACHINE
FOR
USE
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -22
3.2.1 P
RE
-
SETUP
CHECK
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -22
3.2.2 A
SSESSING
THE
WORK
AREA
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -22
3.3 L
IFTING
AND
RIGGING
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -22
3.4 I
NSTALLATION
HAZARDS
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -23
3.5 C
ONFIGURING
THE
ID
CHUCK
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -25
3.6 I
NSTALLING
THE
ID
CHUCK
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -28
3.7 I
NSTALLING
THE
MACHINE
TO
THE
CHUCK
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -28
3.8 I
NSTALLING
THE
MACHINING
ARM
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -29
3.9 I
NSTALLING
THE
COUNTERWEIGHT
ARM
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -30
3.10 C
ENTERING
AND
LEVELING
THE
MACHINE
TO
THE
WORKPIECE
- - - - - - - - - - - - - - - - - - - - -33
3.11 R
OTATING
THE
TOOL
HEAD
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -34
3.12 I
NSTALLING
THE
CUTTING
TOOL
AND
ADJUST
POSITION
- - - - - - - - - - - - - - - - - - - - - - - - -36
3.13 A
DJUSTING
THE
FEED
DIRECTION
,
AXIS
,
AND
AMOUNT
- - - - - - - - - - - - - - - - - - - - - - - - -37
3.14 C
ONNECTING
THE
AIR
MOTOR
TO
THE
MAIN
BODY
,
THE
PCU,
AND
AIR
SOURCE
- - - - - - - - - - - - -39
This section describes the setup and assembly procedures for the FF5300 flange
facer.
3.1
R
ECEIPT
AND
INSPECTION
Your CLIMAX product was inspected and tested prior to shipment, and packaged
for normal shipment conditions. CLIMAX does not guarantee the condition of
your machine upon delivery.
When you receive your CLIMAX product, perform the following receipt checks:
1. Inspect the shipping containers for damage.
2. Check the contents of the shipping containers against the included invoice
to make sure that all components have been shipped.
3. Inspect all components for damage.
Contact CLIMAX immediately to report damaged or missing components.
NOTICE
Keep the shipping container and all packing materials for future storage
and shipping of the machine.
The machine ships from CLIMAX with a heavy coating of LPS 3. The recom-
mended cleaner is LPS PreSolve Orange Degreaser. All parts must be cleaned
before use.
Summary of Contents for FF5300
Page 2: ......
Page 4: ...Page B FF5300 Operating Manual CLIMAX GLOBAL LOCATIONS...
Page 5: ...P N 91025 Rev 4 Page C CE DOCUMENTATION...
Page 12: ...Page vi FF5300 Operating Manual This page intentionally left blank...
Page 20: ...Page 8 FF5300 Operating Manual This page intentionally left blank...
Page 52: ...Page 40 FF5300 Operating Manual This page intentionally left blank...
Page 68: ...Page 56 FF5300 Operating Manual FIGURE A 1 FF5300 ASSEMBLY P N 89900...
Page 69: ...P N 91025 Rev 4 Page 57 FIGURE A 2 FF5300 ASSEMBLY DETAIL P N 89900 7 7...
Page 72: ...Page 60 FF5300 Operating Manual FIGURE A 5 MACHINING ARM ASSEMBLY P N 90337...
Page 74: ...Page 62 FF5300 Operating Manual FIGURE A 7 TOOL HOLDER ASSEMBLY P N 89940...
Page 83: ...P N 91025 Rev 4 Page 71 APPENDIX B SDS Safety Data Sheets are available upon request...
Page 84: ...Page 72 FF5300 Operating Manual This page intentionally left blank...
Page 85: ......
Page 86: ......