Chapter 4 — Commissioning
Part No. 750-295
4-21
4.13.5 Low and High Fire Adjustments
All CFH boilers are factory tested firing natural gas at an altitude of
1000 ft ASL. Operating under different conditions may require re-
adjustment of the gas valve.
Adjustments are made using a TORX® T40 (low fire adjustment) and
3 mm hex wrench (main gas choke). The adjustment screws should
initially be set to half way through each setting’s range. The low fire
adjustment screw is accessed by removing the slotted cap on the gas
regulator using a blade screwdriver (see
adjustment screw is accessed by removing the blue plastic cap from
the valve cover (see
).
Turn the adjustment screw completely clockwise, counting the turns
until the screw will no longer turn. Then, turn the adjustment screw
counterclockwise half the number of turns counted when turning
clockwise.
NOTE:
When adjusting low fire offset, clockwise adjustments
increase
gas flow, and counterclockwise adjustments
decrease
gas
flow.
When adjusting the main gas choke, clockwise adjustments
decrease
gas flow, and counterclockwise adjustments
increase
gas flow.
CFH 70-80 HP and Low Gas Pressure Option
See figures below for low and high fire adjustments on the CFH 70-
80 HP and 30-60 HP with low gas pressure option. Both low and high
fire adjustments are CLOCKWISE to INCREASE gas flow.
When making low fire adjustments, the protective slide on the bottom
of the valve must first be opened. Close and secure the slide when adjustments are complete.
Figure 4-19 Low fire adjustment - low gas pressure option
Figure 4-17 Regulating Adjusting
Screw - Low Fire Adjustment
Figure 4-18 Main Gas Choke -
High Fire Adjustment
Protective
slide
After setting the required pressure :
1. Close protective slide.
2. Secure protective slide closed
with a screw.
Metric
Allen Key
No. 2.5
LOW FIRE
Summary of Contents for ClearFire CFH
Page 14: ...Chapter 1 Introduction 1 8 Part No 750 295 ...
Page 27: ...Chapter 2 Installation Part No 750 295 2 13 Figure 2 10 CFH wiring diagram typical 10 60 HP ...
Page 42: ...Chapter 3 Flue and Combustion Air Venting 3 14 Part No 750 295 ...
Page 90: ......
Page 92: ...Chapter 6 Model CFH Parts 6 2 Part No 750 295 6 1 CONTROL PANEL 10 60 HP ...
Page 93: ...Chapter 6 Model CFH Parts Part No 750 295 6 3 6 1 CONTROL PANEL 70 80 HP ...
Page 100: ...Chapter 6 Model CFH Parts 6 10 Part No 750 295 Standard gas train 30 HP ...
Page 105: ...Chapter 6 Model CFH Parts Part No 750 295 6 15 6 4 2 Gas Train Dual Fuel 30 HP dual fuel ...
Page 106: ...Chapter 6 Model CFH Parts 6 16 Part No 750 295 40 HP dual fuel ...
Page 107: ...Chapter 6 Model CFH Parts Part No 750 295 6 17 50 60 HP dual fuel ...
Page 110: ...Chapter 6 Model CFH Parts 6 20 Part No 750 295 40 HP dual fuel lgp ...
Page 111: ...Chapter 6 Model CFH Parts Part No 750 295 6 21 50 60 HP dual fuel lgp ...
Page 112: ...Chapter 6 Model CFH Parts 6 22 Part No 750 295 6 4 4 Gas Train Propane 30 HP propane ...
Page 113: ...Chapter 6 Model CFH Parts Part No 750 295 6 23 40 HP propane ...
Page 114: ...Chapter 6 Model CFH Parts 6 24 Part No 750 295 50 60 HP propane ...
Page 120: ...e mail info cleaverbrooks com Web Address http www cleaverbrooks com ...