7
Revision date: 02.07.12
CLEARSPAN
™
POLY BUILDINGS
LAY OUT THE BUILDING SITE
The High Boy building frame is designed to be anchored
to the ground or to a concrete foundation. If a concrete
foundation or footing is not used, setting the base of each
rafter on treated planks or concrete pads is recommended.
If boards are used as shown above, the boards must
be staked in place to the proper width of the building
frame.
The on-center frame width for this line of High
Boy buildings is 26' 3-1/2"
. Consult the Quick Start Guide
diagrams for additional dimensions and details.
ATTENTION:
The frame must be anchored to the site.
Securing the frame to boards that are staked in place is
not sufficient to secure the building. Consult the Must Read
document for additional anchoring instructions.
If a concrete foundation or footing is used, the base plates
can be anchored to the foundation or footing before the
frame is assembled. Consult the Base Details diagram
in the Quick Start Guide of these instructions to properly
space and attach the base plates to the foundation.
Consult a qualified professional contractor to properly
anchor the base plates to the concrete foundation.
IMPORTANT:
Materials to anchor the frame to the site or to
secure the base plates to the foundation are not included
and
must be supplied by the customer.
Frame shown above is used to illustrate setting a frame on treated
boards for support. Frame may differ from actual frame.
Space below is reserved for customer notes.
Boards and all
materials needed
to secure the
boards and base
plates in place are
supplied by the
customer.
Base plate design
may differ from
actual design.
Summary of Contents for 106786
Page 26: ...26 Revision date 02 07 12 CLEARSPAN POLY BUILDINGS FRONT PROFILE ...
Page 27: ...27 Revision date 02 07 12 CLEARSPAN POLY BUILDINGS CONNECTIONS ...
Page 30: ...30 Revision date 02 07 12 CLEARSPAN POLY BUILDINGS BASE DETAILS ...
Page 31: ...31 Revision date 02 07 12 CLEARSPAN POLY BUILDINGS SIDE PROFILE 106786 ...
Page 32: ...32 Revision date 02 07 12 CLEARSPAN POLY BUILDINGS SIDE PROFILE 106787 ...
Page 33: ...33 Revision date 02 07 12 CLEARSPAN POLY BUILDINGS SIDE PROFILE 106788 CABLE ENDS HERE ...
Page 34: ...34 Revision date 02 07 12 CLEARSPAN POLY BUILDINGS SIDE PROFILE 106789 ...
Page 35: ...35 Revision date 02 07 12 CLEARSPAN POLY BUILDINGS SIDE PROFILE 106790 ...
Page 36: ...36 Revision date 02 07 12 CLEARSPAN POLY BUILDINGS SIDE PROFILE 106791 ...
Page 37: ...37 Revision date 02 07 12 CLEARSPAN POLY BUILDINGS THIS PAGE RESERVED FOR CUSTOMER NOTES ...