5. With the first rafter temporarily secured using customer-
supplied bracing, lift a second rafter assembly into
position.
NOTE:
Photo shows lifting and setting a rafter into
position. Rafter design differs from actual rafter of the
High Boy frame.
Photo is used for illustration only.
6. Use the Side Profile diagrams found in the Quick Start
Guide to properly space the rafter.
NOTE:
Spacing is measured from the center of the
first rafter base plate to the center of the base plate of
the second rafter.
The on-center rafter spacing for this
series of High Boy buildings is 10'.
If the base plates are anchored to concrete, or were
pre-attached to pressure-treated boards, attach the
rafter using the 1/2" x 4 1/2" bolts as shown in the
Connection - Details diagrams: View 3 (Quick Start).
7. Take one 10' lateral brace (HBT166LB10) and place it
between the two rafters over the studs
on the straight
tubes of each rafter.
8. Install a 1/2" nut and lock washer to keep the brace in
position. DO NOT TIGHTEN AT THIS TIME.
9. Repeat the previous steps to install all lateral braces
between the first two rafters. Adjust the rafter spacing
as needed to keep the rafters plumb.
Photo shows a lateral brace slid over the welded stud of a rafter.
Straight
Rafter Tube
Lateral
Brace
NOTE:
The peak of the frame includes a double run
of lateral braces: attach one to the underside of the
curved rafter tube and attach the other to the top of
the straight tube of rafter as shown above.
This double
run of lateral bracing runs throughout the length of the
frame.
A double run of
side lateral
braces
is installed in these
locations between the end
rafter and the first inside
rafter at each end of the
frame.
IMPORTANT:
This side double
run of braces is located between
the end rafters and the first inside
rafter only in these two locations at
each end.
Tighten these nuts
after installing the
braces.
ASSEMBLE FRAME (CONTINUED)
This side profile
diagram shows the
end rafter, the first
inside rafter, and
the runs of lateral
bracing between
these rafters. There
are two lateral runs
at the peak of the
rafters.
The angled brace
shown is installed
after all lateral runs
are installed.
Two lateral braces
are installed
between the end
rafter and the first
inside rafter at the
position identified by
the arrow. See the
close up diagrams
below.
Rafter
Rafter
Angle Brace
Install two lateral
braces at this location
Lateral Brace
Summary of Contents for 106786
Page 26: ...26 Revision date 02 07 12 CLEARSPAN POLY BUILDINGS FRONT PROFILE ...
Page 27: ...27 Revision date 02 07 12 CLEARSPAN POLY BUILDINGS CONNECTIONS ...
Page 30: ...30 Revision date 02 07 12 CLEARSPAN POLY BUILDINGS BASE DETAILS ...
Page 31: ...31 Revision date 02 07 12 CLEARSPAN POLY BUILDINGS SIDE PROFILE 106786 ...
Page 32: ...32 Revision date 02 07 12 CLEARSPAN POLY BUILDINGS SIDE PROFILE 106787 ...
Page 33: ...33 Revision date 02 07 12 CLEARSPAN POLY BUILDINGS SIDE PROFILE 106788 CABLE ENDS HERE ...
Page 34: ...34 Revision date 02 07 12 CLEARSPAN POLY BUILDINGS SIDE PROFILE 106789 ...
Page 35: ...35 Revision date 02 07 12 CLEARSPAN POLY BUILDINGS SIDE PROFILE 106790 ...
Page 36: ...36 Revision date 02 07 12 CLEARSPAN POLY BUILDINGS SIDE PROFILE 106791 ...
Page 37: ...37 Revision date 02 07 12 CLEARSPAN POLY BUILDINGS THIS PAGE RESERVED FOR CUSTOMER NOTES ...