6
Revision date: 02.07.12
CLEARSPAN
™
POLY BUILDINGS
ClearSpan
™
High Boy Buildings
Diagram may show a different shelter length.
OVERVIEW
This section describes how to assemble your High Boy
building. For details of each assembly procedure, consult
the Quick Start Guide and the individual sections of these
instructions. See illustration below to identify main parts of
shelter.
1. Mark the location of the building and identify the
required parts for each assembly procedure.
2. Assemble all rafters.
3. Assemble and anchor the frame.
4. Install all cable assemblies.
5. Prepare and install the main cover.
Lateral
Brace
End Rafter
Inside Rafter
Rafter Base Plates
Ground Level
Angled
Brace
Angled
Brace
Summary of Contents for 106786
Page 26: ...26 Revision date 02 07 12 CLEARSPAN POLY BUILDINGS FRONT PROFILE ...
Page 27: ...27 Revision date 02 07 12 CLEARSPAN POLY BUILDINGS CONNECTIONS ...
Page 30: ...30 Revision date 02 07 12 CLEARSPAN POLY BUILDINGS BASE DETAILS ...
Page 31: ...31 Revision date 02 07 12 CLEARSPAN POLY BUILDINGS SIDE PROFILE 106786 ...
Page 32: ...32 Revision date 02 07 12 CLEARSPAN POLY BUILDINGS SIDE PROFILE 106787 ...
Page 33: ...33 Revision date 02 07 12 CLEARSPAN POLY BUILDINGS SIDE PROFILE 106788 CABLE ENDS HERE ...
Page 34: ...34 Revision date 02 07 12 CLEARSPAN POLY BUILDINGS SIDE PROFILE 106789 ...
Page 35: ...35 Revision date 02 07 12 CLEARSPAN POLY BUILDINGS SIDE PROFILE 106790 ...
Page 36: ...36 Revision date 02 07 12 CLEARSPAN POLY BUILDINGS SIDE PROFILE 106791 ...
Page 37: ...37 Revision date 02 07 12 CLEARSPAN POLY BUILDINGS THIS PAGE RESERVED FOR CUSTOMER NOTES ...