Shut Down or Power Up an I/O Module
Overview of Fabric Module Support
Change the Amount of Power Reserved for Fabric Modules
Shutting Down or Powering Up a Fabric Module
Guidelines for Configuring Power Redundancy Modes
Maximum Power Available for 3-kW AC Power Supplies
Maximum Power Available for 3-kW DC Power Supplies
Maximum Power Available for 3.5-kW Inputs (AC)
Maximum Power Available for 3.5-kW Inputs (DC)
Displaying the Status for the Fan Trays
Installing or Replacing Modules, Fan Trays, and Power Supplies
C H A P T E R 6
Using an ESD Wrist Strap to Prevent ESD Damage
Installing or Replacing a Supervisor Module
Migrating from Supervisor 2E Modules (N77-SUP2E) to Supervisor 3E Modules (N77-SUP3E)
Installing or Replacing an I/O Module
Migrating from Gen 1 Fan Trays (N77-C7706-FAN) to Gen 2 Fan Trays (N77-C7706-FAN-2)
Installing or Replacing a Fabric Module
Replacing Fabric 2 Modules with Fabric 3 Modules
Recovery Procedure for Downgrading to Fabric 2 Modules from Fabric 3 Modules
Installing or Replacing a Power Supply in a Switch Chassis
Connecting a 3-kW AC Power Supply to AC Power Sources
Connecting a 3.5-kW HVAC/HVDC Power Supply to AC Power Sources
Connecting DC Power Supplies with Power Sources
Connecting a 3.5-kW HVAC/HVDC Power Supply to DC Power Sources
A P P E N D I X A
Cisco Nexus 7706 Hardware Installation Guide
v
OL-31330-01
Contents