Contents
xxi
ATM Switch Router Software Configuration Guide
OL-7396-01
Overview of Structured Circuit Emulation Services
19-18
Configuring Network Clocking for Structured CES
19-19
Configuring a Hard PVC for Structured CES
19-19
Verifying a Hard PVC for Structured CES
19-22
Configuring a Hard PVC for Structured CES with a Shaped VP Tunnel
19-23
Phase 1—Configuring a Shaped VP Tunnel
19-23
Phase 2—Configuring a Hard PVC
19-25
Verifying a Hard PVC for Structured CES with a Shaped VP Tunnel
19-27
Configuring a Soft PVC for Structured CES
19-28
Phase 1—Configuring the Destination (Passive) Side of a Soft PVC
19-30
Phase 2—Configuring the Source (Active) Side of a Soft PVC
19-31
Verifying a Soft PVC for Structured CES
19-33
Configuring a Soft PVC for Structured CES with CAS Enabled
19-34
Verifying a Soft PVC for Structured CES with CAS Enabled
19-36
Configuring a Soft PVC for Structured CES with CAS and On-Hook Detection Enabled
19-37
Verifying a Soft PVC for Structured CES with CAS and On-Hook Detection Enabled
19-38
Creating Multiple Structured Soft PVCs on the Same CES Port
19-38
Phase 1—Configuring the Destination (Passive) Side of Multiple Soft PVCs
19-40
Phase 2—Configuring the Source (Active) Side of Multiple Soft PVCs
19-41
Verifying the Creation of Multiple Structured Soft PVCs on the Same CES Port
19-42
Configuring T1/E1 CES SVCs
19-44
Configuring T1/E1 Unstructured CES SVCs
19-44
Phase 1—Configuring the Destination (Passive) Side of the Unstructured Switched VC
19-45
Phase 2—Configuring the Source (Active) Side of the Unstructured Switched VC
19-46
Verifying a Switched VC for Unstructured CES
19-47
Configuring T1/E1 Structured CES SVCs
19-48
Phase 1—Configuring the Destination (Passive) Side of the Structured Switched VC
19-49
Phase 2—Configuring the Source (Active) Side of the Structured Switched VC
19-51
Verifying a Switched VC for Structured CES
19-53
Reconfiguring a Previously Established Circuit
19-54
Deleting a Previously Established Circuit
19-55
Verifying Deletion of a Previously Established Circuit
19-56
Configuring SGCP
19-56
Operation
19-56
Configuring SGCP on the Entire Switch
19-57
Displaying SGCP
19-57
Configuring CES Circuits for SGCP
19-58
Displaying SGCP Endpoints
19-59
Displaying SGCP Connections
19-60