CHAPTER
Installation
Installing
the
HyperSwitchA100
This
chapter
contains
the following
sections
Installation
Environmental Conditions
Confirming
the Contents
of
the
Shipping
Container
Required
Equipment
for Installation
Main
Unit
Parts
Opening
the
Cover
Setting
Switches
on Cards
and
Boards
Connecting
to
the
NMS
Note
Throughout
this
publication
are abbreviations
for
HyperSwitch
Al00
and
ATM
terms which
are
listed
and
defined
in the appendix
Abbreviations
Environmental Conditions
Install
the
HyperSwitch
A100
in
an area
that
meets
the following
conditions
The
HyperSwitch
A100
remains
operational
within
the temperature
and
humidity
limits
shown
in
Table
1-3
To
ensure
proper
heat
radiation
allow
the
following
minimum
vacant
space
surrounding
the
HyperSwitch
A100
10
cm
approximately
inches
or
moresides
10
cm
approximately
inches
or
morefront
and
rear
10
cm
approximately
inches
or
moretop
The
installation
site
must meet
the following
criteria
Protected
from
water
and
chemicals
Free
of
shock and
vibration
Horizontal
Free
of excessive
dust
Installing
the
HyperSwitch
Al 00
2-1