LIST
OF
FIGURES
ATM
Building
or
Campus
Backbone
1-5
Multiple
Switch Backbone
Network
1-5
Core Network
Design
1-6
Redundant
Network
Design
1-6
Traffic
Measurement
Period
Formula
1-11
HyperSwitch
Al00
Front
Panel
Layout
2-4
HyperSwitch
A100
Rear
Panel
Layout
2-5
HyperSwitch
A100
Internal
View
2-5
Expanded
Internal
View
Motherboard
2-6
PROC
Card
Panel
Layout
2-7
HyperSwitch
A100
Bottom
View
2-7
Sliding the
HyperSwitch
A100
Cover
2-8
Lifting the
HyperSwitch
A100
Cover
2-9
BCONV
Card
DIP
Switches
2-10
Motherboard
Jumper
Switches
2-11
0C3 LINF
Card Jumper
Switch
2-12
PROC
Card
Short
Bars
JP1-JP11
2-12
PROC
Card
Short
Bar
Settings
2-13
Installing
LINF
Card
2-15
Screw
Locations
Seen
from
the Reverse
Side
of the
Cover
2-16
Attaching
Rack
Mount
Installation
Fixture
2-17
Fastening
the
HyperSwitch
A100
to
the
Rack
Mount
2-17
Single-Core
and Two-Core
Cable
2-18
EIA/TJA-232
Cable
Connectors
2-19
Console
Terminal
to
HyperSwitch
A100
Connection
2-19
HyperSwitch
A100
to
Console
Terminal
and
NMS
Connection
2-20
Initial
Installation
Data
Setting
Procedure
Part
2-23
Initial
Installation
Data
Setting
Procedure
Part
2-24
Interdevice
Connections
HyperSwitch
A100
as
Master
3-8
Interdevice
Connections
Another
Device
as
Master
3-10
Removing
the
Screws
Securing
the
LINF
Card
3-12
Replacing
LINF
Card Data
Setting
Procedure
Flowchart
Part
3-15
Replacing
LINF
Card Data
Setting
Procedure
Flowchart
Part
3-16
ROM
Integrated
Circuit Chips
Positions
3-20
Figure
1-1
Figure
1-2
Figure
1-3
Figure
1-4
Figure
1-5
Figure
2-1
Figure
2-2
Figure
2-3
Figure
2-4
Figure
2-5
Figure
2-6
Figure
2-7
Figure
2-8
Figure
2-9
Figure
2-10
Figure
2-11
Figure
2-12
Figure
2-13
Figure
2-14
Figure
2-15
Figure
2-16
Figure
2-17
Figure
2-18
Figure
2-19
Figure
2-20
Figure
2-21
Figure
2-22
Figure
2-23
Figure
3-1
Figure
3-2
Figure
3-3
Figure
3-4
Figure
3-5
Figure
3-6
List
of
Figures
ix