Chapter 2 Installing the GoQAM
16
4004834 Rev D
Installation Process Summary
Before You Begin
This process assumes that you have already installed the GoQAM software on the
DNCS. Refer to the release notes and installation instructions for your GoQAM
release for detailed instructions. Also be sure that you have access to the
Digital
Network Control System Online Help
for your system release before installing the
GoQAM.
GoQAM Installation Processes
The following process summary provides the recommendations for a GoQAM
installation.
Stage
Process
See Procedure
1
Review system requirements and
technical specifications.
N/A
2
Consult your Bandwidth Management
Plan and the GoQAM input and
output specifications to allocate your
bandwidth resources properly.
N/A
3
Unpack and inspect the GoQAM.
Unpack and Inspect the GoQAM
(on page 18)
4
Record the MAC address from the
label located on the underside of the
GoQAM unit.
Record the MAC Address
(on page
19)
5
Install the GoQAM into a rack.
Stacking Guidelines
(on page 20)
Install the Modulator Into a Rack
(on page 24)
6
Connect the GoQAM to an earth
ground and then the power source.
For the 120/230 V AC GoQAM,
connect the power cord.
For the 48V DC GoQAM, connect
the power wires to the DC power
inlet.
Connect Power Sources
(on page
27)
7
Connect other network devices to the
GoQAM, except the RF out ports.
Connect the DVB ASI Input Ports
(on page 29)
Connect the 10/100BaseT Ethernet
Port
(on page 31)
Summary of Contents for GoQAM
Page 1: ...GoQAM Modulator RF Output and IF Output Hardware Installation and Operation Guide ...
Page 2: ......
Page 8: ......
Page 14: ......
Page 30: ......
Page 52: ......
Page 67: ...Provision GoQAMs on the DNCS 4004834 Rev D 51 ...
Page 68: ......
Page 116: ......
Page 138: ......
Page 164: ......
Page 176: ......