![Christie Mirage WQ-L User Manual Download Page 15](http://html.mh-extra.com/html/christie/mirage-wq-l/mirage-wq-l_user-manual_2604030015.webp)
Installation
Mirage WQ-L User Manual
15
020-101372-01 Rev. 1 (04-2014)
Mount the Projector
Mounting points are available on all four sides of the
projector, including the front face. Each side has six
mounting points, two of which are on the front
plate. The front plate has an additional seven front
facing mounting points. Christie recommends that a
minimum of four mounting points are used in any
installation, with at least one of the mounting points
being on the front plate. A 10mm thread
engagement and a minimum torque of 30 in.-lbs
(3.5 Nm) /maximum torque of 35 in.-lbs (4 Nm) is
recommended. For some installations it may be
necessary to remove the front handles once the
projector is in its final location. To remove the
handles use a 5 mm hex driver to loosen the two
socket head cap screws.
Mount a Ruggedized Kit
(optional)
If you are mounting a ruggedized kit use the seven designated
mounting points on the front of the projector. The handles will need to
be removed to access four of these points. Christie does not provide
the ruggedized kit or the hardware to secure a ruggedized kit. Christie
recommends using M6 hardware with a 10 mm thread engagement,
and a maximum torque of 4 Nm.
Do not stack units. Failure to comply could result in minor or moderate injury.
Failure to comply with the following may result in equipment damage:
• Air flows in through the front of the projector and out the rear of the projector.
Insufficient airflow can cause the projector to overheat during operation and / or place
stress on the source connections. When mounting the projector allow for up to 1100
CFM of airflow through the projector. Ambient temperature must stay below 40° C
(95° F).
• Inlet air temperature must be below 40° C (95° F).
• Keep the projector away from all devices radiating electromagnetic energy. For
example, motors and transformers, speakers, power amplifiers, and elevators.
i
The mounting support system and the mounting surface must be evaluated and
accepted by local authorities and must adhere to local standards and safety regulations.
front plate
mounting point
front plate
mounting point