Freeze-dryer Epsilon 2-10D LSCplus
8 Maintenance and service
Version 07/2022, Rev. 3.0 of 20/07/2022
• sb
135 / 161
Translation of the original operating manual
System/
Component
Detail / Part
Inspection
Periodical Maintenance
Repair / Rebuild
Be
fo
re
s
ta
rt
Pe
r wo
rk
in
g
d
a
y
In
s
p
e
c
ti
o
n
R
e
p
la
c
e
m
e
n
t
O
p
e
ra
ti
o
n
Cal
ib
ra
ti
o
n
Stainless steel door
sight glasses: clean,
illumination ok
X
X
Acrylic glass door:
surface clean and
undamaged
X
X
Machinery
–
general
Switch cabinet
X
X
Leakages
X
X
Noise emission
above average
X
X
Dynamic gaskets:
diaphragmas
50 steril.
cycles
Static gaskets:
O-rings, clamp, KF
100 steril.
cycles
Wires: fastened
X
Cable trays: closed
X
Framework:
no corrosion
X
Remove corrosion
Aeration
system
Aeration filter
50 steril.
cycles
Vacuum
system
Pump: Inlet strainer
X
Inspection and
cleaning annually
Pump:
Gas ballast control
X
Inspection and
cleaning annually
Pump:
External fan cover
X
Cleaning annually
Pump: Tip Seals
9,000
operating
hours
Pump: Condition of
motor / drive
X
X
Inspection after every
15000 operating
hours
Pump: Bearings
35,000
operating
hours