I N S T A L L A T I O N
INSTALLATION
Pre-Installation
¾
REVIEW – Review all of the instructions prior to installation.
¾
INSTALLATION – Installation should be performed by licensed and certified
plumbers & electricians.
¾
WORK – All work should be conformed to all local, state, and national regulatory
agency requirements.
¾
INSPECT – Inspect the wash unit for damages that may have occurred during
shipping, workmanship, and verify that all parts have been shipped.
Placement
¾
HANDLING – The units are very heavy and may require the use of moving
equipment. Consult with your local restaurant equipment supplier.
¾
INSPECT – Inspect the area to where the unit is being installed to. Check for
proper clearance with shut off valves and drain line
hook ups.
¾
LEVELING – The unit is equipped with adjustable
bullet feet. Use a wrench or pliers to adjust up or
down.
¾
SEALING – Seal the top of the backsplash to the
wall using an NSF approved silicone sealant.
WARNING
– Heavy lifting may result in bodily injury. Do not lift or move without
adequate help.
48
Summary of Contents for Taskmaster PP-3
Page 2: ...Left Blank This Page Intentionally ...
Page 12: ...O P E R A T I O N I N S T R U C T I O N S 11 NOTES ...
Page 48: ...C O N T R O L P A N E L S 47 NOTES ...
Page 52: ...M A I N T E N A N C E 51 NOTES ...
Page 63: ...P A R T S L I S T 62 NOTES ...
Page 64: ...P A R T S L I S T NOTES 63 ...
Page 65: ...P A R T S L I S T NOTES 64 ...
Page 66: ......