42
once
F
a
c
to
ry
s
e
tt
in
g
DISPLAY
ACTION
CONFIGURATION
x times
Section
Digit 1
Digit 2
Digits 3 and 4
Continuous pump run
4
0
0
: Yes
1
: No
Pump overrun duration
4
2
0
to
5
min by step
0.5 min
4
3
Maximum Central Heating flow
temperature
4
4
50°C
to
80°C
by steps of 1
o
C
Minimum Central Heating flow
temperature
4
5
25°C
to
50°C
by steps of 1
o
C
4
6
CH anti-cycling delay
4
8
0
to
7
min by step
0.5 min
CH maximum output limitation
4
9
Value from
0
to
10
Pmin & Pmax general
Menu - 4 - Boiler settings
Summary of Contents for Minima HE System 24 Nat
Page 19: ...19 1 2 A A Fig 14 Fig 16 Fig 13 11 Installing the Boiler continued Fig 15 P P ...
Page 22: ...22 Fig 21 Fig 22 Fig 23 ...
Page 31: ...31 WIRING DIAGRAM FOR CONNECTION TO AN OPEN VENTED CYLINDER DIAGRAM B ...
Page 32: ...32 WIRING DIAGRAM FOR CONNECTION TO AN MTS UNVENTED CYLINDER DIAGRAM A ...
Page 61: ...61 24 Benchmark Commissioning Checklist ...
Page 62: ...62 25 Service Interval Record ...
Page 63: ...63 ...