16
10. Installation Requirements
(continued)
1.
Internal termination of condensate drainage pipe to internal stack
2.
External termination of condensate drainage pipe via internal discharge branch
(e.g. sink waste) and condensate siphon
iii) Terminating into a gully, below the grid level but above
the water level.
iv) Into a soakaway.
N
OTE
: If any condensate pipework is to be installed
externally then it should be kept to a minimum and be
insulated with a waterproof insulation and have a continuous
fall. The total length of external pipe used should not exceed
3 metres.
Some examples of the type of condensate terminations can
be found below.
Summary of Contents for Minima HE System 24 Nat
Page 19: ...19 1 2 A A Fig 14 Fig 16 Fig 13 11 Installing the Boiler continued Fig 15 P P ...
Page 22: ...22 Fig 21 Fig 22 Fig 23 ...
Page 31: ...31 WIRING DIAGRAM FOR CONNECTION TO AN OPEN VENTED CYLINDER DIAGRAM B ...
Page 32: ...32 WIRING DIAGRAM FOR CONNECTION TO AN MTS UNVENTED CYLINDER DIAGRAM A ...
Page 61: ...61 24 Benchmark Commissioning Checklist ...
Page 62: ...62 25 Service Interval Record ...