39
The boiler is delivered with preset values described
in Menus 3 and 4.
All settings can be changed by the installer or a
qualified person. To gain access to the setting keys
please, open the front cover
P
(Fig. 46).
17. Adjustments and Setting
DISPLAY
2 nd digit
P
1 st digit
3 rd digit
4 th digit
On/Off push button
Reset push button
Menu key
Key
-
Key
+
Setting key
Fig. 47
Fig. 46
Pressing the reset, menu , , , or the setting keys will make the display light. The light will go out 30 seconds after
the last key has been pressed.
To gain access to setting menus press the
and
keys together for 5 seconds. (Fig. 41). Menu 1 will be displayed on the
1st digit of the display.
Changing the menu
:
Press the Menu key (Fig. 47). The menu number is displayed for 3 seconds. Press the Menu key to change between
menus
Setting a parameter in a section
:
Press either the key or the key to change between sections.
Note :
When you arrive at the last section of a menu, pressing the key will move to the the 1st section. When you are
at the first section, pressing the key will move to the last section of the menu.
Changing section in a menu (available only for menu 3 and 4)
:
Press the setting key to enter the modification mode, The 3rd and 4th digits will begin flashing, press the or
keys
to select the correct value then press the setting key to confirm this modification and to exit the setting mode. The 3rd and
4th digits will stop flashing.
Recalling the basic configuration
:
Select Menu
3
or
4
then press the
+
keys together for more than 5 seconds. The digits will flash
CM
for a while to
indicate that the operation is completed.
Erasing the default register
:
Select menu
1
then press the
+
keys together for more than 5 seconds. The digits will flash
CM
for a while to
indicate that the operation is completed.
Note :
To exit the setting mode, leave the boiler for approx. 1 minute the boiler will automatically switch back to user mode.
Summary of Contents for Minima HE System 24 Nat
Page 19: ...19 1 2 A A Fig 14 Fig 16 Fig 13 11 Installing the Boiler continued Fig 15 P P ...
Page 22: ...22 Fig 21 Fig 22 Fig 23 ...
Page 31: ...31 WIRING DIAGRAM FOR CONNECTION TO AN OPEN VENTED CYLINDER DIAGRAM B ...
Page 32: ...32 WIRING DIAGRAM FOR CONNECTION TO AN MTS UNVENTED CYLINDER DIAGRAM A ...
Page 61: ...61 24 Benchmark Commissioning Checklist ...
Page 62: ...62 25 Service Interval Record ...
Page 63: ...63 ...