
Fuses
- lambda probe power supply
IMPORTANT:
When replacing a fuse, be sure turn off the boiler at the main switch and
unplug the power cord.
Note: Be sure to use proper acting fuses M (M = Medium)!
MARK
FUSE
DEVICES
F1
3,15 A, M
Lambda -
PCB
6.3. BOILER OPERATION PROCEDURE
The boiler is controlled with electronic control unit, built in the upper part of the boiler, below upper
casing.
Control unit controls boiler functioning, one heat circuit through 3 way mixing valve with actuator and
outdoor temp. sensor and DHW tank. On the front boiler panel are main switch, for switching on/off
the boiler control unit, safety thermostat and touch screen of control unit.
- Screw refill
- electromagnetic valve
- Feeder screw motor device
- Rotary valve (RSE)
- grate cleaner motor
- Automatic flue gas tubes cleaning
(Flue pass. Cleaner)
PCB
: 51229XXXXXXX
MARK
FUSE
DEVICES
F1
3,15 A, M
F2
1 6
, A, M
- electric heater
F3
3 15
,
A, M
PCB:
BIOPELTEC-D-G (
51229
XXXXXXX
"G"
)
MARK
FUSE
DEVICES
F1
3,15 A, M
F2
3,15 A, M
- Screw refill
- electromagnetic valve
- Feeder screw motor device
- Rotary valve (RSE)
- grate cleaner motor
- Automatic flue gas tubes cleaning
(Flue pass. Cleaner)
- electric heater
-
Technical instructions
BioTec Plus
45