
Connecting
STEP 3:
BioTec Plus - left part of the boiler section view
Put washer, toothed washer and nut on screw like is showned on figure above (B). Tight nut but not
completely tight. Level the body of the right part of the boiler with 4 leveling screws.
STEP 4:
BioTec Plus - left part of the boiler section view
Put washers, toothed washers and nuts on all other screws and start tigth them. If is needed, nivel boiler
(holes are slitted for niveling).
Thight hard all six nuts.
Technical instructions
BioTec Plus
17