
STEP 6:
1
2
3
prepared sockets on left side
of the boiler (wood)
1
2
3
prepared plugs on right side
of the boiler (wood pellets)
On left side of the boiler (wood) are prepared sockets, on right
side of the boiler (wood pellets) are prepared plugs. Cabels must
be connected in right order: 1-1; 2-2; 3-3;
Connecting
Technical instructions
BioTec Plus
21