3.1. INSTALLATION OF DELIVERED PARTS
BioTec Plus is delivered on two wooden pallets. It must be mounted like is described on next pages of
these technical instructions. After the boiler is mounted, should be positioned in the boiler room (see
point 2.0.). Base protection with stone wool push under the boiler as shown in figure 2.a.
In upper chamber of the left side of the boiler are delivered (figure 2.b):
1. holder for cleaning set and 2 cleaning scrapers and cleaning brush
2. room corrector and sensors (2 Acc. (buffer) temperature sensors, 1 return flow sensor, 1 DHW
temperature sensor, 1 outdoor temperature sensor)
Holder for cleaning set can be positioned on lateral side of the boiler (A) or to the wall (B), near the
boiler and easy accessible. On this holder should be placed cleaning set (2 scrapers and brush).
Sensors and room corrector should be connected according heating installation and connecting
scheme.
CHECKING FLUE GAS CHAMBER LID
Before connecting of left (fuel: wood) and right (fuel: wood pellets) sides of boiler is necessary to
check if is right flue gas chamber lid it properly tight. Remove casing cover lid and additionally tight
screws on flue gas chamber lid (like is shown on figure below). Acces to right flue gas chamber will be
disabled after connection left and right side of the boiler.